Working on Rooftop Solar Program is a significant forte of KCPL Solar India. Following is the list of projects undertaken under Rooftop Solar Power projects as per the location specified.
Case study for one of our Rooftop Solar clients:
Waa Solar Pvt. Ltd.
End Customer: MGVCL
Category: EPC Rooftop Solar Program
Capacity: 4.5 MW
Location: Vadodara
For a distributed rooftop project for MGVCL, various customers had diverse needs and apprehensions that needed to be addressed.
Commercial buildings and residential societies expressed a concern that installing solar panels would damage their roofs and cause leakages during monsoon.
KCPL Solar addressed these fears by installing specially designed precast concrete blocks that would not only allay all fears of leakage but would even protect the roof from damage during periods of high wind velocity.
Some owners wanted to retain the ability to put the roof to productive use. In these cases, structures erect to mount the solar panels. The installation was done in compliance with IS standards to ensure that the weight was within permissible limits.
Suitable mounting arrangements were made for industrial roofs with sheets. Even with such attention to detail and diversity of solutions, KCPL Solar successfully commissioned 3.54 MW (till March 2015) in the first phase and subsequent 0.49 MW in the next three months, aggregating 4.03 MW.
Suppose you need a Rooftop Solar Turnkey Project for your business or residence. kindly get in touch with us.
Sr. No. | Site name | Installed Capacity in kW |
1 | Hyundai Showroom, Gorwa | 11.8 |
2
|
Gopinathji, Chevrolet Workshop |
222
|
Schlumberger | ||
3 | Kachiya Wadi | 80.4 |
4 | H S Patel School | 42.33 |
5 | National Tower | 10.71 |
6 | Vraj Siddhi tower | 34 |
7 | Alembic Business Park | 396.48 |
8 | Madhav House | 23 |
9 | ELMEX Connectors | 53.04 |
10 | APMC market HATHIKHANA | 289.4 |
11 | Kalyanrayji complex | 46.32 |
12 | Signet Complex – A | 47.69 |
13 | Signet Complex – B | 14.96 |
14
|
Manjalpur Sports complex |
166.75
|
Manjalpur Sports complex parking | ||
15 | Khanderao Market | 63.22 |
16 | Geotest House | 64.9 |
17 | Vraj Venu tower A | 44.88 |
18 | Ward office no 3 | 8.56 |
19 | Ward office no 9 | 10.62 |
20 | East Zone office | 29.5 |
21
|
GMERS hospital 1 |
569.84
|
Hospital 2 | ||
Hospital 3 | ||
GMERS college 7th floor | ||
GMERS college 9th floor | ||
GMERS PM room | ||
22 | APMC Sayajipura | 682 |
23 | Zenith tins | 528.6 |
24 | Harisewa School | 46.41 |
25 | Amit Khurana House | 9.84 |
26 | Ashok Khurana House | 5.86 |
27 | Advocate Shah, Subhanpura | 11.22 |
28 | SMT Gorwa | 95.9 |
29
|
GSTRC Racecourse main office | 29.83 |
GSRTC Workshop | 39.27 | |
30 | GSRTC Nizampura Bus Depot | 28.56 |
31 | GSRTC Trident Complex | 85.9 |
32 | APMC Sayajipura Cold storage | 42.48 |
33 | APMC Sayajipura Complex | 55.5 |
34 | Sun Enclave Complex | 28.5 |
35 | Solitaire Machines Tools Ltd. | 45 |
36 | Amar Car | 41 |
37 | Post Tension Services | 25 |
38 | Trivedi Institute | 7 |
39 | Residential Rooftops (200 in number) | 500 |
Total | 4538.27 KW |
Sr. No. | Site name | Installed Capacity in kW |
1 | Seva Bhavan | 100 |
2 | East Block | 250 |
3 | Pushpa Bhavan | 500 |
4 | CGO Complex | 150 |
5 | Transport bhavan | 70 |
Total | 1070 KW |
Sr. No. | Site name | Installed Capacity in kW |
1 | Solar PV Car parking, Pune | 20 |
2 | Captive Solar PV plant, Budhani | 10 |
3 | New Age Fire Fighting Pvt. Ltd., Surendranagar | 112.5 |
4 | Saurashtra Medical Center, C U Shah Medical Collage, Surendranagar | 240 |
5 | Wardhman Bharti Trust, C U Shah Engineering Collage, Surendranagar | 90 |
6 | Bhavna Roadways Surendranagar | 5 |
7 | Charusat University, Changa | 10 |
8 | Wabcos , Gurgoan | 40 |
9 | Wild Life Institute, Dehradun | 85 |
10 | Indira Gandhi National Forest Academy, Dehradun | 140 |
11 | National Institute of Hydrology, Roorkee | 186.5 |
Total | 939 KW |